Single Arena – Approximately $8 Million
Seating Capacity
- 308 with standard bench seating
- 481 with optional mezzanine over dressing rooms
Dimensions
- 130′ — 308′
Dressing Rooms
- 6
Public Washrooms
- 2
Ice Surfaces
- 1
Referee Rooms
- 1
Design
- Architectural and engineering included
Rink Foundation
- Concrete slab throughout main floor
Structure Foundation
- Concrete ring beam foundation for Sprung structure
Aluminum Substructure
- 30-year guarantee (pro-rated)
Membrane
- 20-year guarantee Performance Architectural Membrane
Perimeter Wall
- 8’6″ high Sprung Shield Hard-Wall
Insulation
- 9″ Johns Manville Formaldehyde-Free fibreglass blanket (rated R30)
Green Footprint
- Relocatable, energy-efficient and more
NHL-Quality Ice Surface
- 85′ — 200′ concrete slab (6″ thick)
- Drainage system, sand base, sub-soil heat piping, rigid insulation, 6 mm poly, pipe chairs and rebar
- 21″ thick ice structure
Ice System Refrigeration
- Self-contained Direct Expansion Halocarbon Refrigeration
- Optional ammonia-based system available
- High-efficiency compressors and evaporators
- Heavy-duty steel headers, seamless tubing, insulation and vapour barrier, header and transmission lines, and header trench
Ice System Mechanical
- Piping with service and check valves
- Properly sized piping for refrigerant velocities and oil carrying
Playing Area Features
- NHL-style galvanized steel dasher board system
- Player, penalty & scorekeeping boxes
- Player access gates
- 5′ — 8′ high glass upper shielding
- Netting on rink-ends
Public Access Area Features
- Washrooms with accessories & partitions
- Viewing area
- Concession area with coiling shutter (equipment extra)
- First aid area
- Office area
- Skate-sharpening area
- Mechanical rooms per code
Dressing Room Features
- Benches, showers & bathroom vanities
Floors
- Rubber skate flooring in skate access areas
- Resilient flooring in office & concession
- Ceramic tile in washrooms and showers
- Remaining floors in concrete with sealer
Ceilings
- T-bar acoustic ceilings in lobby, concession & offices
- FRP panel on dressing room shower ceilings
Openings
- Aluminum storefront double-glass entrance door with overhead sensor
- Hollow metal access doors
Finishes
- Drywall
- Painting
Mechanical
- All plumbing fixtures and service to 3′ from structure
- Heating and ventilation using a combination of radiant and forced-air heating units
- Sprinkler system
Electrical
- Distribution system using a combination of T5 lamps in most areas and pot lights in other areas